Our main items are Needle Roller bearings, Cylindrical Roller Bearings, Rod conclude Bearings, Spherical simple bearings, Observe roller Bearings for Guideway, Roller Bearings, Combine Bearings for forklifts, Drinking water Pump Bearings, SNR Auto Bearings and all types of Spherical Bearings. With EPG model registered in a lot more than 70 nations around the world like The usa , Europe , Japan and so on, it has companions between entire world leading enterprises, this kind of as JOHNDEERE, NEW HOLLAND, CLAAS, HONDA, KUBOTA, YANMAR, etc. our products are marketing effectively in the American, European, South American and Asian markets. 6 Tons EPT Stationary Dock Ramp
Major Specification:
Model | DCQ 6-.five | DCQ 6-.6 | DCQ 10-.5 | DCQ 10-.six | DCQ fifteen-.five | DCQ fifteen-.six |
Loading Ability(Kg) | 6000 | 6000 | 10000 | 10000 | 15000 | 15000 |
Platform Size (mm) | 2000*2000 | 2500*2000 | 2000*2000 | 2500*2000 | 2000*2000 | 2500*2000 |
Lip Duration (mm) | 400 | four hundred | 400 | 400 | four hundred | four hundred |
Vacation (mm) | plusmn250 | plusmn300 | plusmn250 | plusmn300 | plusmn250 | plusmn300 |
EPT EPTT (Kw) | .75 Kw | .75 Kw | .seventy five Kw | .75 Kw | .seventy five Kw | .seventy five Kw |
WeigEPTT (Kg) | 810 | 930 | 860 | 980 | 1050 | 1180 |
EPTT Voltage | AC380V | AC380V | AC380V | AC380V | AC380V | AC380V |
Description:
Stationary Dock Leveler is a mounted loading products and broadly utilized as a bridge among platform and the EPT. It permits the forklift to move conveniently. A single aspect of this products has the very same heigEPTT with platform, and the other side connecting with the EPT and it can alter heigEPTT according to diverse EPT and various carriage in the procedure of loading .Its measurement and loading capability can be made according to customer’s requirements.
Principal Attributes:
one. Superb design, compact EPTally controller,
two. EPTTorted EPT system, straightforward to work and trustworthy operation.
3. Lip plate and platform utilised to connect the EPTT aXiHu (West EPT) Dis.s, high power and reliability.
four. EPTTorted seals to defend the EPT program in an outstanding sealing functionality.
five. All round module EPTTed EPT station, sealing and EPTT support daily life.
six. EPT-intensity quotU quot-formed beam style to shield their EPTT-operating high-load with out deformation.
seven. With non-slip tread plate, the platform has a excellent skid resistance.
eight. Equally sides of the fortification rolling pin apron, to stop accidental injuries brought on by the toes stretching platform.
nine. Protection of maintenance staff to EPTTr the board with an inner bridge maintenance protection rod.
StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd Configurations:
. Italian Model EPT Program
. Supporting Bar for Safety Maintenance
. Total Assortment Toe Guard
. EPT Bumpers
Optional Configurations:
. A220/50Hz
. The EPT System with Cease Gadget
Installtions:
A. Put in dock leveler and/or dock carry unit in ready opening in accordance with manufacturer’s instructions.
B. Set square and amount.
C. Anchor unit securely, flush with dock. Weld back again of dock leveler to pit body. Contact-up welds with matching paint.
D. Install dock bumpers in accordance with manufacturer’s recommendations.
Factory EPT:
EPTTs amp EPTT:
Other Relevant EPT:
EPTT Profile:
As a subsidary company of EPTEPT EPT Industry EPTT Limited, EPTTlift (HangEPT) EPTTry Co Ltd. Is a HangEPT-primarily based planet-wide provider of lifting products. With more than 20 several years of experience in the lifting sector, we have the knowledge to help you in aquiring your following lifting products.
We EPTTize in making in a assortment of aerial carry and aerial operate system tools for your EPT application. Based on our personal production knowledge and refer to European EPTs design theory and manufacturing EPT.
We are also the CE accredited manufacture and joined IPAF member.
Our Certificates:
EPTT with Consumers:
A: How is that for high quality manage in your manufacturing facility?
B: The good quality manage is strictly in accordance with ISO9001 quality management program. When the goods are finished, the inspection is one hundred% executed strictly
one. Rigid high quality handle system on the EPTT approach of creation
two. EPTTorted crucial arts to make certain the higher high quality of our products
3. Superior equipment and instruments for assessment and good quality manage
four. 100% stringent examining items prior to cargo
5. All the good quality complaints and improvement specifications are alwaEPTTstudied critically, if affordable, set into follow instantly.
A: What is the supply time for your merchandise?
B: It is 30 daEPTTafter orEPTTconfirmation.
A: How EPTT is your quality guarantee period of time?
B: We have one particular 12 months warranty.