We will offer greatest services and higher good quality goods with all sincerity. EPG is a skilled manufacturer and exporter that is concerned with the layout, development and generation. Our primary items are Needle Roller bearings, Cylindrical Roller Bearings, Rod conclude Bearings, Spherical plain bearings, Keep track of roller Bearings for Guideway, Roller Bearings, Mix Bearings for forklifts, Drinking water Pump Bearings, SNR Auto Bearings and all kinds of Spherical Bearings. we could provide custom made design hoist, these kinds of as the cage, typical dimension is 3m*one.5m*two.4m(L*W*H)
it also could be 2m*1.3m*2m(L*W*H), other people also could be obtainable.
For the mast EPT of the building hoist, it usually is 650mm*650mm*1508mm, other individuals these kinds of as
450mm*450mm*1508mm, 800*800*1508mm also could be accessible.
The design velocity is divided into a few scope: 1. Low pace 36m/min 2. Medium velocity: 40-60
m/min 3. EPT velocity: sixty-90m/min.
Remember to notify us below parameters if you inquiry:
1. ability in tons or kgs? 2. solitary or double cage? 3. Pace necessary in m/min? four. other
EPTT space minimal.
Definition: EPTT lift is a type of EPTT that makes use of EPT rack-pinion EPTT method or
wire rope lifting strategy to make the cage go vertically or obliquely to transportation individuals and supplies.
Usage: Its excellent tools extensively used in construction and other fields, such as EPTT, civil
design, bridge building, underground design, massive chimney building and other
areas to transport materials and staff, as a long lasting or semi-permanent development elevate can
also be used in warehouses and EPT towers and other situations.
Our company SC sequence development elevators are divided into three EPTs and two EPTs for every the
EPTT method also EPTT line frequency manage, PLC programmable management and frequency
conversion manage (line frequency/frequency conversion handle) for each the management method. The EPTT
line frequency operating speed is 33m/min the variable frequency managing speed is divided into –
40m/min, -54m/min, -63m/min, -75m/min, -120m/min.
The cross EPT dimensions of the hoist XiHu (West EPT) Dis.Hu (West EPT) Dis. rail(mast EPT) are: 450 times450mm, 650 times650mm,
650 times900mm, 800 times800mm, and the heigEPTT is all 1508mm
The development hoist cage proportions are: 1.8m times1.35m times2.2m, 3m times1.5m times2.4m,three.2m times1.5m times2.4m,
three.2m times1.7m times2.4m,four.5m times1.6m times2.6m
SC sequence design hoist EPT rack-and-pinion EPTT adopts EPTd EPT from
property and abroad. Soon after a long time of introduction, absorption and re-innovation, the style is novel, the
framework is affordable, the procedure is straightforward, the assembly and disassembly is hassle-free, the
physical appearance is gorgeous, and the perform is safe and dependable.
The principal structural elements of mast EPT are produced of Q345B materials, and the structural areas are
undertake combined gas safety welding EPT. The weld seams are beautiful in appearance and
high quality, and boost the services existence of the equipment. Every single portion is shot blasting and then sprayed
the mast EPT can be hot galvanized for great corrosion resistance. At the same time, it has excellent
lower temperature resistance and reaches minus forty degC.
For the EPTT system, EPTs, back again rollers, rollers and other components that have an effect on the
easy managing of the EPTT EPTT, more enhance the processing and manufacturing precision,
increase ease and comfort, stability, basic safety and trustworthiness, and lessen the upkeep instances.
Primary EPT elements are SchneiEPTTbrand and the items are subject to stringent technical
testing and EPTT tests to make sure the higher quality of the merchandise before leave manufacturing facility.
EPT operation, no influence, and cozy ride Adjustable speed, start off and cease employing minimal
velocity, regular operation adopt higher speed, improve perform efficiency.
Quick lifting could fulfill the requirements of development efficiency for large-increase buildings .
The beginning present is significantly less than the rated functioning current, and the requirements for the EPTT
source gear are reduced.
When beginning, the EPT and the rack EPT have tiny influence, which efficiently lowers the use of
the shifting parts. When the motor brakes, the inverter and the motor brake function in coordination.
When brakes at the lower speed of the motor, the brake disc put on is tremendously diminished, and the support
lifestyle of it is proEPTTed. Minimize the upkeep occasions.
The functioning recent with full load growing is generally the very same as that of the EPTT hoist. The
working existing is modest when the no-load or ligEPTT load rises and falls, and the strength-preserving and
environmental defense effect is remarkable, which can conserve a lot more than thirty% of strength.
The challenging tooth floor EPTT construction compact, high EPTT effectiveness, huge
bearing capability and EPTT provider daily life.
Model | Rated capacity kg | EPT velocity m/min | Max lifting heigEPTT m | EPT kw |
Type of EPTT |
SC200/two hundred | 2 times2000 | 33 | 200 | two times3 times11 | worm EPT |
SC200/200 | two times2000 | 33 | 200 | 2 times3 times8.five | EPTEPT |
SC200/two hundred | two times2000 | 33 | a hundred and fifty | two times2 times13 | EPTEPT |
SC320/320 | two times3200 | -40 | 300 | 2 times2 times13 | helical EPT EPTTl EPT |
SC200/200 | two times2000 | -54 | three hundred | 2 times2 times20 | helical EPT EPTTl EPT |
SC200/two hundred | 2 times2000 | -sixty three | three hundred | two times3 times15 | helical EPT EPTTl EPT |
SC200/200 | 2 times2000 | -75 | 300 | two times3 times20 | helical EPT EPTTl EPT |
SC200/two hundred | 2 times2000 | -a hundred and twenty | 300 | two times3 times20 | helical EPT EPTTl EPT |
Framework of the constrution hoist:
Enclosure
The enclosure is processed by chilly plate punching, which
has strong corrosion resistance and beautiful visual appeal.
#8226The enclosure door frame adopts EPTd framework, and the door
edge is rigid and not simple to be deformed, ensuring easy opening
of the door, and hassle-free installation, transportation and storage.
EPT Cage:
The main power-getting elements of the cage are made of Q345B cold-shaped steel, which has higher
power and gorgeous appearance.
The cage leading guardrail is made by bending EPTT. The floor treatment method of guardrail,
cage door and enclosure door body adopts pickling-phosphating method and spray
processing, which is gorgeous and durable.
Exterior Electric powered EPTT Box
Trunking protection
Enlarge the dimensions of the link bolt of the cage load bearing roller seat examine with
other manufacturing facility,EPTTrove the neighborhood composition, managing a lot more steady of the cage.
Primary Equipment
A few EPT EPTT mechanism
Two EPT helical EPT-EPTTl type frequency EPTT mechanism
(~54m/min)2 times20kW
Our products have perfect and reliable EPT and mechanical
interlocking protection units: door safety change, damaged rope
protection change, upper and decrease restrict swap, limit change and
other EPTT interlock switches, integral forging variety
security security hook, protection device, counterweigEPTT EPTT rope
sort and base buffer.
The higher and lower restrict vacation switch adopts the French SchneiEPTTbrand, with
good trustworthiness and substantial repeatability.
The overload protector adopts EPTTngXiHu (West EPT) Dis. Feida. When the weigEPTT in the cage reaches
or exceeds its set worth, the corresponding relaEPTTin the limiter operate separately
and are connected with the elevator handle method to make the elevator function
properly and reliably.
Electric EPTT Technique
Cage Prime Frequency EPTT Box
elevator adopts PLC programmable manage technique, which has a delay control operate,
which reduces the start off and cease impacts, operates smoothly, and has a fault self-prognosis
function, which is convenient for upkeep.
The primary EPT components of the cage prime frequency management box undertake Schneider
manufacturer. The merchandise are subject matter to strict complex tests and full EPTT examination to
make sure the large quality of the items.
Yet another domestic cost-effective frequency converter is offered for customers to pick ,
which is also safe and reputable.
The exterior brake device of the traditional frequency conversion elevator has no short
circuit security, and the developed-in braking unit of the EPTT building hoist has the
function of resistance short circuit safety. In comparison with the EPTT frequency
conversion electrical management cabinet, it is small in dimension, sophisticated in appearance, and
embedded in the cage. Committed logic brake timing manage makes certain protection and reliability
by EPTTltaneously starting frequency and present to open the gate. When jog procedure
frequently, it has zero EPT zone payment function, no vibration and falling
phenomenon.
Welcome your inquiry us!!!