Our AdvantagesProducts Large volume in Stock, No MOQ necessary We comply with all the worldwide specifications, such as ISO9001 and TS16949 standards. Our primary goods are Needle Roller bearings, Cylindrical Roller Bearings, Rod conclude Bearings, Spherical simple bearings, Monitor roller Bearings for Guideway, Roller Bearings, Merge Bearings for forklifts, H2o Pump Bearings, SNR Car Bearings and all varieties of Spherical Bearings. We also can design and style and make non-regular items to meet customers’ particular demands. Stationary Dock Leveler For Loading Cargo
Primary Specification:
Product | DCQ 6-.five | DCQ 6-.six | DCQ ten-.five | DCQ 10-.6 | DCQ fifteen-.5 | DCQ 15-.six |
Loading Capability(Kg) | 6000 | 6000 | ten thousand | ten thousand | 15000 | 15000 |
Platform Measurement (mm) | 2000*2000 | 2500*2000 | 2000*2000 | 2500*2000 | 2000*2000 | 2500*2000 |
Lip Length (mm) | four hundred | 400 | 400 | 400 | four hundred | four hundred |
Journey (mm) | plusmn250 | plusmn300 | plusmn250 | plusmn300 | plusmn250 | plusmn300 |
EPT EPTT (Kw) | .seventy five Kw | .seventy five Kw | .75 Kw | .75 Kw | .seventy five Kw | .seventy five Kw |
WeigEPTT (Kg) | 810 | 930 | 860 | 980 | 1050 | 1180 |
EPTT Voltage | AC380V | AC380V | AC380V | AC380V | AC380V | AC380V |
Description:
Stationary Dock Leveler is a fastened loading tools and commonly utilised as a bridge amongst system and the EPT. It permits the forklift to go conveniently. One particular facet of this products has the very same heigEPTT with system, and the other facet connecting with the EPT and it can adjust heigEPTT according to diverse EPT and various carriage in the method of loading .Its dimensions and loading ability can be made according to customer’s requirements.
Primary Characteristics:
one. Excellent layout, compact EPTally controller,
two. EPTTorted EPT program, straightforward to function and dependable procedure.
3. Lip plate and system used to hook up the EPTT aXiHu (West EPT) Dis.s, high strength and trustworthiness.
4. EPTTorted seals to shield the EPT system in an outstanding sealing performance.
5. All round module EPTTed EPT station, sealing and EPTT service daily life.
6. EPT-intensity quotU quot-formed beam style to protect their EPTT-managing large-load with out deformation.
seven. With non-slip tread plate, the system has a great skid resistance.
eight. Each sides of the fortification rolling pin apron, to stop accidental injuries induced by the toes stretching platform.
9. Security of upkeep personnel to EPTTr the board with an inner bridge routine maintenance security rod.
StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd Configurations:
. Italian Manufacturer EPT Method
. Supporting Bar for Security Upkeep
. Entire Variety Toe Guard
. EPT Bumpers
Optional Configurations:
. A220/50Hz
. The EPT System with End Gadget
Installtions:
A. Set up dock leveler and/or dock lift unit in well prepared opening in accordance with manufacturer’s instructions.
B. Established sq. and level.
C. Anchor device securely, flush with dock. Weld back of dock leveler to pit body. Contact-up welds with matching paint.
D. Install dock bumpers in accordance with manufacturer’s instructions.
Factory EPT:
EPTTs amp EPTT:
Other Connected EPT:
EPTT Profile:
As a subsidary firm of EPTEPT EPT Sector EPTT Minimal, EPTTlift (HangEPT) EPTTry Co Ltd. Is a HangEPT-dependent globe-extensive supplier of lifting products. With in excess of twenty years of knowledge in the lifting business, we have the expertise to assist you in aquiring your following lifting equipment.
We EPTTize in generating in a range of aerial elevate and aerial perform system equipment for your EPT application. Based on our very own manufacturing expertise and refer to European EPTs layout theory and production EPT.
We are also the CE accredited manufacture and joined IPAF member.
Our Certificates:
EPTT with Customers:
A: How is that for high quality control in your manufacturing facility?
B: The top quality control is strictly in accordance with ISO9001 high quality administration program. When the goods are finished, the inspection is 100% executed strictly
1. Stringent quality management method on the EPTT process of creation
2. EPTTorted important arts to make sure the large quality of our items
three. Advanced tools and equipment for evaluation and top quality control
four. a hundred% strict analyzing merchandise prior to shipment
five. All the top quality grievances and advancement requirements are alwaEPTTstudied significantly, if realistic, put into practice instantly.
A: What is the supply time for your items?
B: It is 30 daEPTTafter orEPTTconfirmation.
A: How EPTT is your high quality promise period?
B: We have 1 calendar year guarantee.